The commissioning of the project, whose installation and construction processes have been completed, is carried out with a dedicated technical team and independently authorized third party organizations when necessary. It is managed in a complete and traceable manner with the highest level of adaptation, while meeting the commissioning requirements that vary according to the different legislation and standards of the countries.

After commissioning of each electronic and mechanical system, their performance is tested digitally and analogously, and the process is monitored and recorded on the platform jointly used with the employer.

Lastly; All performed tests performed and the commissioned systems are stored in the electronic document management system with project-based CRB files.

image